Sunday, August 28, 2016

Leading Edge Slats & Flaperons


8/27/16 - Wired up the Left Landing Light and installed it into the L.H. end of the Leading Edge Slat. Total Time = 5 hours.


Wired Up and Installed L.H. Landing Light


Landing Light Works!
8/28/16 - Installed the Inboard L.H. Leading Edge Slat and the end cap. Total Time = 5 hours.
Inboard L.H. Leading Edge Slat Installed
L.H. Leading Edge Slat Completed.
9/4/16 - Installed the R.H. Flaperon onto the R.H. Wing. Total time = 5 hours.

R.H. Flaperon Installed With Splice Plate
9/5/16 - Installed the L.H. Flaperon onto the L.H. Wing. Total time = 5 hours.

L.H. Flaperon Installed

9/24/16 - Installed R.H. Landing Light in the R.H. Leading Edge Slat. Total time = 5 hours.
Affixing the wire for the R.H. Landing Light
9/25/16 - Installed Inboard Leading Edge Slat and End Cap. Total Time = 5 hours.

L.H. Leading Edge Slat Completed.
Total Leading Edge Slats & Flaperons Installation Time = 25 Hours.

No comments:

Post a Comment