Sunday, February 25, 2018

Covers, Plates and Misc.




Outside Work
5/13/17 - Installed and riveted Pitot & Static Tube plate. Total time = 1 hour.

Riveted Pitot/Static Tube Plate

5/20/17 - Fabricated fuel line cover from spare aluminum. Total time = 4 hours.


Fuel Line Cover Fabricated.
5/27/17 - Installed fuel line cover on underbelly of the fuselage. Total time = 6 hours.

Installing Fuel Line Cover.

6/17/17 - Installed wing root inspection plates on the underside of the L.H. & R.H. wings. Total time = 4 hours.
Inspection Plates Installed
Interior


7/21/17 - Started installing carpeting on cabin interior. Total time = 4 hours.

Carpet Installation Started
8/19/17 - Carpeting continues with the cabin ceiling. Total time = 6 hours.

Cabin Ceiling Carpeted
9/2/17 - Installed headphone connectors after baggage compartment is carpeted. Total time = 3 hours.
Headphone Connectors Installed

10/21/17 -Seat belts/shoulder harnesses installed after carpeting of interior. Total time = 6 hours.
Seat Belts/Shoulder Harnesses Installed

10/28/17 - Yoke boot cover installed. Total time = 2 hours.

Yoke Boot Cover
11/25/18 - Cut two holes in the instrument panel in order to install two muffin size cooling fans for the iPads while flying during the hot summer. Total time = 6 hours.

I-Pad Cooling Fans Installed in Instrument Panel.
12/2/17 - Installed 5 Volt DC converter for cooling fans. Total time = 5 hours



5 Volt DC Converter
12/22/17 - Ordered Levil Technologies Beacon instrumentation for the ADSB-Out Solution which is FAA mandated for 1/1/2020.
Beacon ADSB-Out Antenna



1/13/18 - Installed Beacon LCD display into the instrument panel. Total Time = 6 hours.
Levil Technologies Beacon LCD Display
1/14/18 - Drilled holes on fuselage undercarriage for installation of the Beacon ADSB-out antenna. Total time = 2 hours.


Holes Drilled for Beacon Antenna

1/20/18 - Beacon antenna installed into undercarriage. Total time = 2 hours.

Beacon Antenna Installed
1/21/18 - Beacon wired into instrument panel and working. Total time = 3 hours

Instrument Panel Now Full


1/27/18 - Installed Artex 345 Emergency Locating Transmitter in back of the baggage area. total time = 6 hours.

ELT Installed Behind R.H. Baggage Area



1/28/18 - Installed remote ELT switch on passenger side back wall of the baggage area. Total time = 2 hours.
Remote ELT Switch Installed on Passenger Side Baggage Wall



5/28/18 - Fabricated two "L" angle braces for the instrumentation panel to the firewall and then fitted the forward top panel skin between the instrument panel and the firewall. Total time = 5 hours.

Top Skin in Place
6/1/18 - Took some time to get my Private Pilot Certificate but finally accomplished it today. 
My Private Pilot Certificate

6/2/18 - Riveted the Forward Top Panel Skin to the instrumentation Panel and the Firewall. Total Time = 3 hours.

Forward Top Panel Skin Riveted
6/3/18 - Fitted, drilled and riveted the two middle & two rear windows into place on the fuselage. Total time = 5 hours.

Riveted Windows Into Place
A Look From the Inside
Total Covers, Plates and Misc. Installation Time = 81 Hours.





















Empennage Assembly

Elevator & Rudder


10/8/16 - Prepared the rudder cables by using the cable lug crimping tool to form the connection for the cables. Total time = 4 hrs.



Crimping the End of the Cable.
10/15/16 - Prepared the rudder flange by drilling holes in the mounting bracket on the rudder. Total time = 2 hours.


Rudder Mounting Bracket

10/29/16 - Installed rudder assembly onto the tail of the fuselage. Total time = 6 hrs.
Rudder attached to Fuselage Tail

11/12/16 - Rudder stops were installed on the left & right side of the fuselage. Total time = 4 hours.
Rudder Stops Installed
11/19/16 - Safety wire installed on the cable turnbuckles. Total time = 4 hours.
Safety Wire Installed


4/1/17 - Prepared and installed the elevator cables on the inside of the fuselage. Total time = 6 hours.

Elevator Cables Hooked Up.

4/2/17 - Safety wires were installed on the elevator cable turnbuckles. Total time = 3 hrs.
Elevator Cables Safety Wired.


4/8/17 - Rudder cables attached to the rudder pedals. Total time = 2 hours.


Rudder Cables Connected to Rudders.
4/15/17 - Elevator fairing attached to the top of the fuselage. Total time = 2 hrs.


Fairing Attached to Top of Fuselage
4/22/17 - Elevator trim motor access panel installed on the underside of the elevator. Total time = 2 hours.



Elevator Trim Motor Access Panel Installed


4/29/17

4/29/17 - Elevator inspection panels installed. Total time = 4 hours.
Tightening Cover
Inspection Panel

Inspection Panel



Total Empennage Assembly Time = 39 Hours.