Sunday, August 28, 2016

Leading Edge Slats & Flaperons


8/27/16 - Wired up the Left Landing Light and installed it into the L.H. end of the Leading Edge Slat. Total Time = 5 hours.


Wired Up and Installed L.H. Landing Light


Landing Light Works!
8/28/16 - Installed the Inboard L.H. Leading Edge Slat and the end cap. Total Time = 5 hours.
Inboard L.H. Leading Edge Slat Installed
L.H. Leading Edge Slat Completed.
9/4/16 - Installed the R.H. Flaperon onto the R.H. Wing. Total time = 5 hours.

R.H. Flaperon Installed With Splice Plate
9/5/16 - Installed the L.H. Flaperon onto the L.H. Wing. Total time = 5 hours.

L.H. Flaperon Installed

9/24/16 - Installed R.H. Landing Light in the R.H. Leading Edge Slat. Total time = 5 hours.
Affixing the wire for the R.H. Landing Light
9/25/16 - Installed Inboard Leading Edge Slat and End Cap. Total Time = 5 hours.

L.H. Leading Edge Slat Completed.
Total Leading Edge Slats & Flaperons Installation Time = 25 Hours.

Sunday, July 24, 2016

Wing Attachment

7/15/16 - Prepared wing struts for attachment to the wings and fuselage. Total time = 7 hours.

Drilling the Wing Strut Brackets

7/16/16 - Aligning and leveling the wings to the fuselage. Total time = 4 hours.




7/17/16 - Completed attaching the forward struts to the wings and the fuselage. Total time = 8 hours.

Wings Attached With Forward Struts

7/23/16 - Rear struts attached to the fuselage and the wings. Total time = 5 hours.

Rear Struts Attached

7/24/16 - Both struts are now attached to the fuselage and wings. Total time = 1 hour


Both Struts Attached
7/24/16 - Installed the door closer on the L.H. & R.H. doors. Total time = 3 hours.

Door Closers Installed on Both L.H. & R.H. Doors
7/31/16 - Installed the R.H. Jury Struts to the R.H. Wing and R.H. Wing Struts. Total Time = 4 Hours.

Attaching Jury Struts
8/6/16 -  Installed the L.H. Jury Struts to the L.H. Wing and L.H. Wing Struts. Total Time = 4 Hours.

Jury Struts Completed
Total Wing Attachment Time = 36 Hours.