Friday, February 24, 2012

Landing Lights

Left Landing Light

2/12/12 - Assembled mounting hardware including riveting nut plates to mounting bracket and installed LED light assembly to bracket. Marked placement of landing light assembly on Left Leading Edge Slat. Cut opening in slat with aluminum knife, rounded corners and cleaned up edges with a file. Total Time = 8 hours.

Landing Light with Bracket and Opening Cut in Slat
2/19/12 - Drilled rivet holes in light mounting bracket and placed assembly inside the leading edge slat. Marked proper placement of landing light rivet holes in the slat skin. Drilled holes in the skin and clecoed LED Landing Light assembly in place. Total Time = 5 hours.


Landing Light Clecoed in Place
Total Landing Light Assembly Time = 13 Hours.

No comments:

Post a Comment